GL20 6EW, MORETON C.CULLIMORE(GRAVELS)LIMITED, EPR/BP3922LW/A001: environmental permit consultation
Overview
We are seeking your comments on an environmental permit application received from MORETON C.CULLIMORE(GRAVELS)LIMITED for:
Bow Farm
Bow Lane, Ripple
GL20 6EW
We can take account of
- Relevant environmental regulatory requirements and technical standards.
- Information on local population and sensitive sites.
- Comments on whether the right process is being used for the activity, for example whether the technology is the right one.
- The shape and use of the land around the site in terms of its potential impact, whether that impact is acceptable and what pollution control or abatement may be required.
- The impact of noise and odour from traffic on site.
- Permit conditions by providing information that we have not been made aware of in the application, or by correcting incorrect information in the application (e.g. monitoring and techniques to control pollution).
We cannot take account of
- Issues beyond those in the relevant environmental regulations.
- Anything outside the remit of the EPR, e.g. the proposed location of the site, which is done by the local authority via land use planning.
- Whether a site should have a formal designation under Habitats Directive or other conservation legislation.
- Whether the activity should be allowed or not as a matter of principle. For example we will not consider whether wood, gas, or coal should be burnt to produce electricity; only that the options and environmental impact of say wood has been considered. We will not consider whether a waste incinerator proposal should be turned into a sorting and recycle proposal, only that the incinerator options and effect have been considered.
- Land use issues when determining a permit application, even if changing the location of the activity would improve its environmental performance.
- The impact of noise and odour from traffic travelling to and from the site.
- The legally defined process we follow to determine a permit.
- The granting of a permit/variation if the operator is able to demonstrate that they can carry out the activity without significant risk to the environment or human health.
Online Consultation
Closes 22 May 2026
Opened 23 Apr 2026
Related
- Environmental Permit Application Privacy Notice.pdf 102.6 KB (PDF document)
- About this consultation.pdf 107.0 KB (PDF document)
- Application Bespoke Form Part A Redacted A001 24112025.pdf 342.3 KB (PDF document)
- Application Bespoke Form Part B2 Redacted A001 24112025.pdf 509.6 KB (PDF document)
- Application Bespoke Form Part B4 A001 24112025.pdf 1.7 MB (PDF document)
- Application Bespoke Form Part F1 A001 24112025.pdf 1.5 MB (PDF document)
- Application Bespoke (1) Noise and vibration Impact Assessment 2018 A001 24112025.pdf 5.3 MB (PDF document)
- Application Bespoke (2) Noise response July 2020 A001 24112025.pdf 5.3 MB (PDF document)
- Application Bespoke (3) Noise response Dec 2020 A001 24112025.pdf 1.3 MB (PDF document)
- Application Bespoke (4) Noise response Feb 2021 A001 24112025.pdf 115.0 KB (PDF document)
- Application Bespoke (5) Noise response May 2021 A001 24112025.pdf 1.4 MB (PDF document)
- Application Bespoke (6) Amended Noise & Vibration Management Plan v2 2025 A001 24112025.pdf 1.8 MB (PDF document)
- Application Bespoke 250926.v01 BOWFEPR Bow Farm Waste Recovery Plan(Report) A001 24112025.pdf 256.6 KB (PDF document)
- Application Bespoke 250927.v01 BOWFEPR Bow Farm CQA Plan(Report) A001 24112025.pdf 271.9 KB (PDF document)
- Application Bespoke 251039.v01 BOWFEPR Bow Farm EPR ESSD(Report) A001 24112025.pdf 409.5 KB (PDF document)
- Application Bespoke 251039.v01 BOWFEPR Bow Farm EPR ESSD(Report) A001 24112025.pdf 409.5 KB (PDF document)
- Application Bespoke 251040.v01 BOWFEPR Bow Farm EPR GRA(Report) A001 24112025.pdf 209.8 KB (PDF document)
- Application Bespoke 251041.v01 BOWFEPR Bow Farm EPR HRA(Report) A001 24112025.pdf 582.4 KB (PDF document)
- Application Bespoke 251042.v01 BOWFEPR Bow Farm EPR SRA(Report) A001 24112025.pdf 359.0 KB (PDF document)
- Application Bespoke A001 Validation RFI Response - 251038.v02 BOWFEPR Bow Farm EPR ERA(Report) 15012026.pdf 367.6 KB (PDF document)
- Application Bespoke A001 Validation RFI Response - Bespoke Risk Assessment Schedule v02 15012026.pdf 358.5 KB (PDF document)
- Application Bespoke A001 Validation RFI Response - BOWFEPR2511-1 15012026.pdf 1.3 MB (PDF document)
- Application Bespoke A001 Validation RFI Response - BOWFEPR2511-2 b 15012026.pdf 1.2 MB (PDF document)
- Application Bespoke A001 Validation RFI Response - BOWFEPR2511-2b 15012026.pdf 1.2 MB (PDF document)
- Application Bespoke A001 Validation RFI Response - BOWFEPR2511-3 b 15012026.pdf 1001.7 KB (PDF document)
- Application Bespoke A001 Validation RFI Response - BOWFEPR2511-3b 15012026.pdf 1001.7 KB (PDF document)
- Application Bespoke A001 Validation RFI Response - BOWFEPR2511-4b 15012026.pdf 492.0 KB (PDF document)
- Application Bespoke A001 Validation RFI Response - BOWFEPR2511-5 15012026.pdf 886.5 KB (PDF document)
- Application Bespoke A001 Validation RFI Response - BOWFEPR2511-6 15012026.pdf 877.1 KB (PDF document)
- Application Bespoke A001 Validation RFI Response - BOWFEPR2511-7 b 15012026.pdf 1.7 MB (PDF document)
- Application Bespoke A001 Validation RFI Response - EMS Bow Farm Climate Change Adaptation Risk Assessment 15012026.pdf 242.8 KB (PDF document)
- Application Bespoke A001 Validation RFI Response - EMS Complaints Procedure 15012026.pdf 191.5 KB (PDF document)
- Application Bespoke A001 Validation RFI Response - EMS Contingency Plan Procedure 15012026.pdf 194.0 KB (PDF document)
- Application Bespoke A001 Validation RFI Response - EMS ERP2 Spillages of Fuel and Chemicals 15012026.pdf 171.9 KB (PDF document)
- Application Bespoke A001 Validation RFI Response - EMS Group Emergency Response Plans 15012026.xlsx 210.1 KB (Office Excel 2007 XML workbook)
- Application Bespoke A001 Validation RFI Response - EMS P4 Vehicle oil & fuel leak procedure 15012026.pdf 207.0 KB (PDF document)
- Application Bespoke A001 Validation RFI Response - EMS P14 Site Equipment and Maintenance Procedure 15012026.pdf 215.8 KB (PDF document)
- Application Bespoke A001 Validation RFI Response - General Risk Assessment Schedule v02 15012026.pdf 331.5 KB (PDF document)
- Application Bespoke A001 Validation RFI Response - P15 Inert waste Tipping Procedure Bow Farm 15012026.pdf 197.8 KB (PDF document)
- Application Bespoke Appendix 2 - Method Specification A001 24112025.pdf 56.7 KB (PDF document)
- Application Bespoke Application Email Redacted A001 24112025.pdf 127.1 KB (PDF document)
- Application Bespoke Bespoke Risk Assessment Schedule A001 24112025.pdf 297.7 KB (PDF document)
- Application Bespoke Bow Farm Deposit for Recovery EPR Appendix Index A001 24112025.pdf 244.4 KB (PDF document)
- Application Bespoke Bow Farm Deposit for Recovery EPR Application checklist A001 24112025.pdf 51.0 KB (PDF document)
- Application Bespoke Bow Farm Enviro Insight Report A001 24112025.pdf 7.2 MB (PDF document)
- Application Bespoke Bow Farm Geo Insight Report A001 24112025.pdf 5.7 MB (PDF document)
- Application Bespoke Bow Farm GW level monitoring data A001 24112025.xlsx 43.2 KB (Office Excel 2007 XML workbook)
- Application Bespoke Bow Farm GW quality monitoring data A001 24112025.xlsx 39.8 KB (Office Excel 2007 XML workbook)
- Application Bespoke Bow Farm Inert Waste Phases 1 to 9 LandSim Model 141025 A001 24112025.rst 999.0 KB (Octet Stream)
- Application Bespoke Bow Farm Inert Waste Phases 1 to 9 LandSim Model 141025 A001 24112025.sim 39.4 KB (Octet Stream)
- Application Bespoke Bow Farm Inert Waste Phases 1 to 9 LandSim Rogue Load Model 141025 A001 24112025.rst 1009.9 KB (Octet Stream)
- Application Bespoke Bow Farm Inert Waste Phases 1 to 9 LandSim Rogue Load Model 141025 A001 24112025.sim 39.4 KB (Octet Stream)
- Application Bespoke Bow Farm proposed GW compliance limits A001 24112025.xlsx 46.9 KB (Office Excel 2007 XML workbook)
- Application Bespoke Bow Farm SCR v1 A001 24112025.pdf 200.7 KB (PDF document)
- Application Bespoke Bow Farm WAC WAP v01 November 2025 A001 24112025.pdf 112.2 KB (PDF document)
- Application Bespoke BOWFEPR2511-1 A001 24112025.pdf 1.3 MB (PDF document)
- Application Bespoke BOWFEPR2511-2 A001 24112025.pdf 1.2 MB (PDF document)
- Application Bespoke BOWFEPR2511-3 A001 24112025.pdf 993.7 KB (PDF document)
- Application Bespoke BOWFEPR2511-4 A001 24112025.pdf 490.8 KB (PDF document)
- Application Bespoke BOWFEPR2511-5 A001 24112025.pdf 886.5 KB (PDF document)
- Application Bespoke BOWFEPR2511-6 A001 24112025.pdf 877.1 KB (PDF document)
- Application Bespoke BOWFEPR2511-7 A001 24112025.pdf 1.6 MB (PDF document)
- Application Bespoke BOWFEPR2511-8 A001 24112025.pdf 135.8 KB (PDF document)
- Application Bespoke BOWFEPR2511-9 A001 24112025.pdf 209.7 KB (PDF document)
- Application Bespoke Combined Proforma sheets A001 24112025.pdf 223.6 KB (PDF document)
- Application Bespoke Combined rainfall graphs A001 24112025.pdf 847.8 KB (PDF document)
- Application Bespoke Combined Scheme Drawings A001 24112025.pdf 36.1 MB (PDF document)
- Application Bespoke DEMP 2025 A001 24112025.pdf 700.0 KB (PDF document)
- Application Bespoke Drawings Clarification Email A001 03122025.msg 248.5 KB (Octet Stream)
- Application Bespoke EA Inert Waste Guidance - Annex 1 A001 24112025.pdf 112.7 KB (PDF document)
- Application Bespoke EA Inert Waste Guidance - Annex 2 A001 24112025.pdf 109.1 KB (PDF document)
- Application Bespoke EMS Manual Issue 5 A001 24112025.pdf 327.1 KB (PDF document)
- Application Bespoke GCC - APP_T1600_W_23_3324695 Appeal Decision A001 24112025.pdf 275.6 KB (PDF document)
- Application Bespoke General Risk Assessment Schedule A001 24112025.pdf 318.4 KB (PDF document)
- Application Bespoke GWP Report No. 190714.v02 A001 24112025.pdf 169.2 MB (PDF document)
- Application Bespoke GWP Report No. 240522.v01 A001 24112025.pdf 300.8 KB (PDF document)
- Application Bespoke GWP Report No. 240526.v01 A001 24112025.pdf 578.0 KB (PDF document)
- Application Bespoke GWP Report No. 240707.v02 A001 24112025.pdf 71.2 MB (PDF document)
- Application Bespoke GWP Report No. 241008.v01 A001 24112025.pdf 1.4 MB (PDF document)
- Application Bespoke LEMP P6 April 2025 A001 24112025.pdf 7.8 MB (PDF document)
- Application Bespoke MCC BF EA241125 A001 24112025.pdf 73.7 KB (PDF document)
- Application Bespoke Receipt of Application A001 02122025.eml 118.1 KB (email message)
- Application Bespoke River Severn at Saxons Lode graphs A001 24112025.pdf 939.8 KB (PDF document)
- Application Bespoke TCM details and certs Redacted A001 24112025.pdf 4.3 MB (PDF document)
- Application Bespoke WCC - 19_000048_CM Decision Notice A001 24112025.pdf 322.1 KB (PDF document)
- Application Bespoke WM1 to WM8 BH Logs A001 24112025.pdf 5.3 MB (PDF document)
- RE EPRBP3922LWA001 Bow Farm - Request for Information.msg 12.8 MB (Octet Stream)
Audiences
- Anyone from any background
Interests
- Environmental permitting
- Permit pages
- Waste
Share
Share on Twitter Share on Facebook