160 results
-
Information on Clayton Hall Landfill Site, Whittle le Woods, Lancashire
We have created this page to provide easy access to information on Clayton Hall Landfill Site. Since December 2023, we have recorded an increased number of reports of odour from Clayton Hall Landfill site. We will keep the community up to date with any developments on our response to the increased reports and will share any new updates here. Please check back regularly for further information. This page was last updated on 11 April 2024 ... MoreClosed 30 April 2024 -
Derby City Council, NPS/WR/037226: Hydro Electric Power Production Consultation
We are seeking your comments on an application received from Derby City Council . The application is to vary licence serial number 03/28/48/0042/R01 to abstract water from River Derwent at Longbridge Weir in Derby between National Grid References SK 35631 36300 and SK 35649 36304 for the purpose of transferring it without intervening use to Longbridge Weir hydroelectric power scheme. MoreClosed 23 May 2024 -
Alconbury Brook Flood Alleviation Scheme - information page
Through the Alconbury Brook Flood Alleviation Scheme, we are developing a way forward to reduce the risk of flooding from the Alconbury Brook in Alconbury and Alconbury Weston. Flooding in Hamerton Road, Alconbury Weston, January 2021 Background to the scheme The Alconbury Brook catchment is relatively ‘flashy’ in comparison to the wider River Great Ouse catchment, meaning that is reacts quickly to rainfall and the onset of flooding can be rapid. ... MoreClosed 25 May 2024 -
Environment Agency charge proposals for materials facilities
Materials facilities are regulated waste operations that receive over 1,000 tonnes of waste a year and separate it into specified output material such as glass, metal, paper, or plastic to allow this material to be recycled by other facilities or persons. For operators of a materials facility, we propose to: amend the additional subsistence charge for materials facilities operations, so it better reflects costs of regulatory activity change how we bill customers for the... MoreClosed 5 June 2024 -
Fisherplace Hydro Limited, NPS/WR/040110: Hydro Electric Power Production Consultation
We are seeking your comments on an application received from Fisherplace Hydro Limited . The application is to vary licence serial number NW/075/0007/003 which authorises the abstraction of water from Fisherplace Gill at National Grid Reference (NGR) NY 32539 18184 for the purpose of power production. MoreClosed 13 June 2024 -
Programme of measures for Upper Costa Beck
Welcome to the consultation on updating the programme of measures for Upper Costa Beck. Everyone’s views are welcomed. You can respond online on this website. If you would prefer to respond using a response form, you can download one under 'related documents' below. All responses will be considered. We will publish a summary of your responses on GOV.UK following analysis of responses. The closing date of this consultation has been extended from the 3rd of June to the 24th... MoreClosed 24 June 2024 -
Holderness Drain Flood Alleviation Scheme (FAS) - Information Page
The Holderness Drain Flood Alleviation Scheme has come to an end and this page is no longer being updated. It will remain open until April 2025, for anyone wanting to read the information below. Welcome to the Holderness Drain Flood Alleviation Scheme Information Page. We have created this page to provide information on the Holderness Drain Flood Alleviation Scheme (FAS). This will reduce the risk of flooding to homes in the North Carr and Sutton areas of Hull. ... MoreClosed 30 June 2024 -
Consultation on the Environment Agency’s Enforcement and sanctions policy
This consultation closed on 16 July 2024. You can read the consultation response document on GOV.UK: Enforcement and sanctions policy updates to include UK ETS and CORSIA: Consultation response document The Environment Agency enforcement and sanctions policy has been updated to make reference to the UK Emissions Trading Scheme (UK ETS) and the Carbon Offsetting and Reduction Scheme for International Aviation (CORSIA). Annex 2 now has an updated section A to take... MoreClosed 16 July 2024 -
Fisherplace Hydro Limited, NPS/WR/042465 & NPS/WR/042466: Hydro Electric Power Production Consultation
We are seeking your comments on an application received from Fisherplace Hydro Limited. The first application is for a licence to obstruct or impede the flow of Stanah Gill at Thirlmere, Cumbria at National Grid Reference NY 32962 18802. The impounding works are to facilitate the abstraction of water for Hydroelectric power generation. The second application is for a full licence to abstract (take) water from Stanah Gill at Thirlmere, Cumbria at ... MoreClosed 15 August 2024 -
Norfolk Rivers Drainage Board , NPS/WR/040865: New impoundment licence consultation
We are seeking your comments on an application received from Norfolk Rivers Drainage Board . The application is for a licence to obstruct or impede the flow of the River Lark at Turf Lock, Mildenhall, Suffolk at National Grid Reference TL 70841 74251. MoreClosed 16 August 2024 -
Environment Agency charge proposals for boat registration from January 2025
This consultation is now closed. We received a total of 1,726 responses, and have taken these responses into consideration when finalising our response document. You can access the response document using the following link Environment Agency charge proposals for boat registration from January 2025 - GOV.UK ------------------------------------------------------------------------------------------------------------ The Environment Agency is the second largest navigation... MoreClosed 16 August 2024 -
SP11 6DB, Vitacress Salads Limited, P.5768/H/95/V001
We are seeking your comments on an environmental permit application received from Vitacress Salads Limited for Lower Link Farm Lower Link St Mary Bourne Andover Hampshire SP11 6DB We can take account of Relevant environmental regulatory requirements and technical standards. Information on local population and sensitive sites. Permit conditions by providing information that we have not been made aware of in the application, or... MoreClosed 2 September 2024 -
Toronto Close Flood Risk Management Scheme
Page created September 2023. Last updated 9 November, 2023. Background of flooding in Toronto Close, Worcester Toronto Close, Worcester has a history of flooding from the River Severn and River Teme, which influence the water level in the Laughern Brook during and after heavy rainfall. Recent flood events in July 2007 and February 2020 have highlighted that there are a number of residential properties at risk of flooding. In 2007, 16 properties... MoreClosed 21 September 2024 -
Standard Rules Consultation No 28 - Proposals for a new standard rules permit for research and development at a Part A(1) Installation
The purpose of this consultation is to introduce new standard rules to allow operators of existing installations to carry out research and development (R&D) activities for the innovation, introduction, and improvement of products and processes associated with the permitted activities. The proposed standard rules, which would be applied for by variation to an installation permit, allow the operation of time limited R&D under existing permit conditions and subject... MoreClosed 30 October 2024 -
Gooseum Rhyne Reservoir Improvement Scheme
The Gooseum Rhyne Reservoir is a flood storage area on the Congresbury Yeo River. It was classified as a reservoir in 2006 under the Reservoirs Act 1975 due to the volume of water it can hold above the adjacent natural ground. As a designated reservoir structure, the Environment Agency has the legal responsibility to ensure its continued safe operation. Following an inspection by a reservoir specialist, areas for improvements that must be made in the... MoreClosed 3 November 2024 -
Lower Mole Flood Alleviation Scheme revised shortlisted options
The Lower Mole Flood Alleviation Scheme protects around 1,300 homes and businesses in the area from flooding. It was designed to reduce the risk of flooding in the lower reaches of the River Mole catchment following a significant flood event in September 1968. Construction of the scheme took several years and was completed in the 1980s. The Scheme covers the stretch of the River Mole from Hersham up to the River Thames. This also includes the River Ember, an engineered... MoreClosed 6 November 2024 -
The Environment Agency, NPS/WR/040734: New impoundment licence consultation
We are seeking your comments on an application received from The Environment Agency . The application is for an impoundment licence to refurbish the radial gates and install a fish and eel pass at Benson Weir on the River Thames at Preston Crowmarsh, Wallingford, Oxfordshire at National Grid Reference SU 61351 91207. MoreClosed 15 November 2024 -
Pevensey to Eastbourne Phase 1 survey
The Pevensey Bay to Eastbourne Coastal Management Scheme aims to increase the resilience of homes, businesses and infrastructure between Cooden Beach and Holywell to coastal flooding and erosion over the next 100 years. It is one of the largest coastal flood risk projects in the country and is being delivered by the Environment Agency and Eastbourne Borough Council and working closely with a wide number of other key partner organisations. Please access this... MoreClosed 30 November 2024 -
Environment Agency, NPS/WR/041112 & NPS/WR/041113: New impoundment licence consultation
We are seeking your comments on an application received from The Environment Agency . The application is for two new impoundment licences to authorise the replacement of the bottom hinged tilting gate with a vertical lift gate at Meadowgate, Sheffield on the River Rother between National Grid References SK 45432 82777and SK 45444 82781 and replacement of the vertical lift sluice gate spanning the River Rother at Canklow, Rotherham between National Grid References... MoreClosed 12 December 2024 -
Sizewell C Limited, NPS/WR/043048: New abstraction licence consultation
We are seeking your comments on an application received from Sizewell C Limited . The application is for a full licence to abstract water from underground strata (sand and gravel deposits – crag formation) at two areas within the following National Grid References: Area A: TM 47351 64534, TM 47353 64530, TM 47284 64508 and TM 47283 64512. Area B: TM 47361 64504, TM 47363 64500, TM 47294 64477 and TM 47293 64482. MoreClosed 20 December 2024 -
Sizewell C Limited, NPS/WR/043202: New abstraction licence consultation
We are seeking your comments on an application received from Sizewell C Limited . The application is for a licence to abstract water from underground strata (sand and gravel deposits – crag formation) at four areas within the following National Grid References: Area A: TM 45417 63520, TM 45426 63524, TM 45429 63518 and TM 45420 63514 Area B: TM 45427 63501, TM 45435 63506, TM 45438 63500 and TM 45430 63496 Area C: TM... MoreClosed 20 December 2024 -
Eardisland Scheme
The village of Eardisland has a history of flooding, with much of the village sitting in the floodplain of the River Arrow. Significant property flooding has occurred multiple times in recent years. To reduce the damaging consequences of flooding to properties and residents, should future flooding occur, the Environment Agency is providing Property Flood Resilience (PFR) to those at flood risk. The purpose of this website is to keep residents informed about the scheme and... MoreClosed 24 December 2024 -
Environment Agency, NPS/WR/042596 and NPS/WR/040145: New abstraction and impoundment licence consultation
We are seeking your comments on 2 applications received from Environment Agency . The first application is for a transfer licence to abstract water from the Par St Blazey Stream at National Grid Reference SX 07505 53498 to transfer it to the River Par at National Grid Reference SX 07515 53503 without intervening use for the purpose of an eel pass. The second application is to obstruct or impede the flow of the Par St Blazey Stream... MoreClosed 25 December 2024 -
Environment Agency, NPS/WR/041115: New impoundment licence consultation
We are seeking your comments on an application received from Environment Agency . The application is for an impoundment licence to authorise and control the removal of the Auckley Gauging Station weir on the River Torne at Auckley, Doncaster, at National Grid Reference SE 64593 01217. MoreClosed 26 December 2024 -
Corsham Flood Risk Management Improvements on the Byde Mill Brook Information Page
The Byde Mill Brook currently flows through a culvert (pipe) underneath many properties in Corsham. The amount of water it can hold is limited and, due to its age, is in need of repair. This summer (2021) we have begun work on considering flood management options for the Byde Mill Brook area, in the centre of Corsham. This is called an appraisal process. The work will tell us of the extent of any problems, both now and in the future, as well as considering what may be... MoreClosed 31 December 2024 -
Citizens’ Jury for the River Wharfe (Yorkshire) - Information Page
The Rethinking Water Citizens’ Jury was put together by the Environment Agency and a Local Advisory Group working with the Involve Foundation. The jury, which took place at the end of February/early March 2021, debated local issues, shared ideas and questioned environmental experts on all aspects of the water environment. This project to involve communities in decisions about the future of their local river took place in Yorkshire. The River Wharfe Citizens’ Jury... MoreClosed 31 December 2024 -
Ouse Washes Section 10 Works information page
The purpose of this page is to provide information on how we comply with the Reservoirs Act 1975 and how we maintain the protection from flood risk for homes and businesses along the Ouse Washes. The Ouse Washes Flood Storage Reservoir, is a 90,000,000m 3 flood storage reservoir located in Cambridgeshire. It is approximately 30km (19 miles) long and up to 0.8km (0.5 miles) wide providing 1,900 hectares (approximately 4,700 acres) of land between the banks. The Dutch Engineer, Sir... MoreClosed 31 December 2024 -
Strand Quay
Noisy piling work from 4 November 2024 We expect these works to commence on 4 November 2024 and for this to last for up to eight days, although it could be less depending on progress. Our piling activities will take place between 8:30 and 13:00 and then from 13:30 to 16:00. Our piling will not be noisy throughout this entire period but will comprise of a series of bursts of between 30 to 40 minutes each. We have looked to see if we can limit the noisy bursts to specific times... MoreClosed 31 December 2024 -
Drought: how it is managed in England
The Environment Agency has a duty to safeguard water resources in England and make sure there is enough water for people and the environment. We do this by: regulating the abstraction of water monitoring the environment working with the water industry and other abstractors to ensure they manage their water supplies effectively We monitor, assess, report and act to minimise the impact of drought on the... MoreClosed 10 January 2025 -
Environment Agency charge proposals for April 2025: Reducing waste crime and updating time and materials charges
The Environment Agency carries out a wide range of regulatory services. They are fundamental to how we protect the environment. These include flood and coastal erosion risk management, regulation of water quality and abstraction, waste, pollution prevention and navigation. We know it works – England is a much cleaner, greener place because of our activities. We charge the businesses we regulate for the work we do to regulate them. We are committed to making sure our... MoreClosed 20 January 2025
160 results.
Page 3 of 6