The Gooseum Rhyne Reservoir is a flood storage area on the Congresbury Yeo River. It was classified as a reservoir in 2006 under the Reservoirs Act 1975 due to the volume of water it can hold above the adjacent natural ground.
As a designated reservoir structure, the Environment Agency has the legal responsibility to ensure its continued safe operation.
Following an inspection by a reservoir specialist, areas for improvements that must be made in the interests of safety were identified. We are now in the process of developing a solution to ensure the reservoir continues to operate safely and that it can be properly maintained.
Since we last met in February, we’ve been updating our proposals and are now ready to share these updates with you ahead of submitting our planning application in January 2024.
We are hosting the same event on separate days to provide more flexibility for you to be able to come and talk to us.
Event details can be found below.
|
Day 1 |
Day 2 |
Date |
Saturday, 14 October 2023 |
Wednesday, 18 October 2023 |
Time |
11am to 3pm |
3pm to 8pm |
Venue |
Jubilee Hall Room, Old School Rooms, 1 Station Road, Congresbury, BS49 5DY. |
You can view our current proposals here. We’d love to hear your thoughts, our feedback form can be downloaded here.
The September 2023 Gooseum Newsletter can be found here.
If you have an interest in our scheme, please join us at one of our public drop-in events, or if you’re unable to come along, please do have a look at our proposals, which will be uploaded to the site just before the first event, and fill out a feedback form.
If you have an interest in the improvement work we’re doing to the Gooseum Rhyne Reservoir, you can join our mailing list by emailing us at gooseumreservoir@environment-agency.gov.uk.
Your views will always be taken into consideration, and if there is scope to incorporate your preferences into the way works are carried out, without compromising their efficacy and safety, we will endeavour to do so.
The summary of responses will be published within 12 weeks of the consultation closing.
We would like to invite you to one of our public drop-in events. Since we last met in February, we’ve been updating our proposals and are now ready to share these updates with you ahead of submitting our planning application in January 2024.
We are hosting the same event on separate days to provide more flexibility for you to be able to come and talk to us.
We would like to invite you to one of our public drop-in events. Since we last met in February, we’ve been updating our proposals and are now ready to share these updates with you ahead of submitting our planning application in January 2024.
We are hosting the same event on separate days to provide more flexibility for you to be able to come and talk to us.
Share
Share on Twitter Share on Facebook