DN14 0DS, Tetron Contracts LTD,EPR/JP3342YM/A001: environmental permit consultation
Closes 4 Aug 2025
Opened 2 Jul 2025
Overview
We are seeking your comments on an environmental permit application received from Tetron Contracts Ltd for
Middleton Quarry Landfill
Heck & Pollington Lane
Pollington
DN14 0DS
We can take account of
- Relevant environmental regulatory requirements and technical standards.
- Information on local population and sensitive sites.
- Comments on whether the right process is being used for the activity, for example whether the technology is the right one.
- The shape and use of the land around the site in terms of its potential impact, whether that impact is acceptable and what pollution control or abatement may be required.
- The impact of noise and odour from traffic on site.
- Permit conditions by providing information that we have not been made aware of in the application, or by correcting incorrect information in the application (e.g. monitoring and techniques to control pollution).
We cannot take account of
- Issues beyond those in the relevant environmental regulations.
- Anything outside the remit of the EPR, e.g. the proposed location of the site, which is done by the local authority via land use planning.
- Whether a site should have a formal designation under Habitats Directive or other conservation legislation.
- Whether the activity should be allowed or not as a matter of principle. For example we will not consider whether wood, gas, or coal should be burnt to produce electricity; only that the options and environmental impact of say wood has been considered. We will not consider whether a waste incinerator proposal should be turned into a sorting and recycle proposal, only that the incinerator options and effect have been considered.
- Land use issues when determining a permit application, even if changing the location of the activity would improve its environmental performance.
- The impact of noise and odour from traffic travelling to and from the site.
- The legally defined process we follow to determine a permit.
- The granting of a permit/variation if the operator is able to demonstrate that they can carry out the activity without significant risk to the environment or human health.
Give us your views
Related
- Privacy Notice 102.6 KB (PDF document)
- About this consultation 114.4 KB (PDF document)
- Non Technical Summary 92.3 KB (PDF document)
- HRA Appendix 3 GWQ 95.0 KB (Office Excel 2007 XML workbook)
- Pollington Lane Landfill - DQRA FINAL DRAFT 11.8 MB (PDF document)
- Site Condition Report final 158.2 KB (PDF document)
- Monitoring Plan 112.1 KB (PDF document)
- Environmental Site Setting 650.0 KB (PDF document)
- Cultural & Natural Heritage 525.1 KB (PDF document)
- Sch5 response - email 752.0 KB (Microsoft Word Document)
- Schedule 5 Notice 196.0 KB (PDF document)
- Schedule 5 Notification - Response - 163407 DEMP December 715.8 KB (PDF document)
- Schedule 5 Notification - Response - 163407-D-006 Monitoring Plan Dec 3.0 MB (PDF document)
- Schedule 5 Notification - Response - App E Tanker Pump 360.6 KB (PDF document)
- Schedule 5 Notification - Response - email 4.9 MB (Microsoft Word Document)
- Schedule 5 Notification - Response - EMS summary 163407-SMS 124.7 KB (PDF document)
- Schedule 5 Notification - Response - H Austin CCC Mar 23 500.7 KB (PDF document)
- Schedule 5 Notification Request email 366.0 KB (Microsoft Word Document)
- Schedule 5 Notification 143.2 KB (PDF document)
- Schedule 5 Response - 1763-HRA-R2 Pollington 12-3-25 - 18032025 1.9 MB (PDF document)
- Schedule 5 Response - 163407 DEMP January 2025 COMP 4.8 MB (PDF document)
- Schedule 5 Response - 163407-D-006 Monitoring Plan 223.6 KB (PDF document)
- Schedule 5 Response - 163407-D-007 Post Landfill Monitoring Plan 222.1 KB (PDF document)
- Schedule 5 Response - 163407-D-007 Post Landfill Monitoring Plan 222.1 KB (PDF document)
- Schedule 5 Response - Email 5.1 MB (Microsoft Word Document)
- Schedule 5 Response - EPR JP3342YM- Overview Response March 185.6 KB (PDF document)
- Schedule 5 Response - Landfill Gas Risk Assessment Mar25 final comp 522.4 KB (PDF document)
- Schedule 5 Response - Standard Report_25-05164-20250220 162535 673.7 KB (PDF document)
- Schedule 5 response 07052025 - 163407-CS-D-004 Cross Section Soakaway 171.4 KB (PDF document)
- Schedule 5 response 07052025 - 163407-D-008 Drainage Plan 144.8 KB (PDF document)
- Schedule 5 response 07052025 - email 542.0 KB (Microsoft Word Document)
- Application Email 207.0 KB (Microsoft Word Document)
- HRA Email JP3342YM A001 488.0 KB (Microsoft Word Document)
- RFI Response 1763-HRA-R1 12-7-24 appended 8.9 MB (PDF document)
- RFI Response 163407 DEMP July 2024 COMP 1005.3 KB (PDF document)
- RFI Response 163407 ESSD July24 263.0 KB (PDF document)
- RFI Response 163407 H1ERA 182.7 KB (PDF document)
- RFI Response 163407 OP July 2024 COMP 655.8 KB (PDF document)
- RFI Response 163407_CAP COMP 853.9 KB (PDF document)
- RFI Response 163407_NMP COMP 820.1 KB (PDF document)
- RFI Response 163407-CS-D-001 Cross Section Overview Plan 449.6 KB (PDF document)
- RFI Response 163407-CS-D-002 Cross Section Plan A-AA 311.1 KB (PDF document)
- RFI Response 163407-CS-D-003 Cross Section Plan B-BB & C-CC 307.4 KB (PDF document)
- RFI Response 163407-CSM-001 SW to NE 467.2 KB (PDF document)
- RFI Response 163407-CSM-002 W to E 405.5 KB (PDF document)
- RFI Response 163407-D-001 Site Location Plan 379.1 KB (PDF document)
- RFI Response 163407-D-003 Site Layout Plan 207.5 KB (PDF document)
- Response 163407-D-004 Existing & Basal Contour Plan 400.3 KB (PDF document)
- RFI Response 163407-D-005 Restoration Plan 229.4 KB (PDF document)
- RFI Response 163407-D-006 Monitoring Plan 207.2 KB (PDF document)
- Response 163407-D-007 Post Landfill Monitoring Plan 210.2 KB (PDF document)
- RFI Response 163407-D-008 Drainage Plan 201.3 KB (PDF document)
- RFI Response 163407-D-ESSD-001 Environmental Site Setting 646.4 KB (PDF document)
- RFI Response 163407-D-ESSD-002 Cultural & Natural Heritage 525.0 KB (PDF document)
- RFI Response App A 163407_EC_A_Context 2.0 MB (PDF document)
- RFI Response App A 163407_EC_A_Datasheet 758.2 KB (PDF document)
- RFI Response App A 163407_EC_A_GeologyDatasheet 1.2 MB (PDF document)
- RFI Response App A 163407_EC_A_HistSlice10000 4.4 MB (PDF document)
- RFI Response App A 163407_EC_A_SiteSenSeg2500 703.8 KB (PDF document)
- RFI Response App A 163407_EC_A_SiteSenSlice10000_Soil_Geochemistry 1.9 MB (PDF document)
- RFI Response App A 163407_EC_A13_HistSeg2500 5.3 MB (PDF document)
- RFI Response App B AAE Pollington Quarry Restoration Acoustic Report 1005.3 KB (PDF document)
- RFI Response App D 163407 - Pollington Lane Landfill - DQRA FINAL DRAFT 30.04.21 11.8 MB (PDF document)
- RFI Response ASL Report 270-22-610-13 Middleton Quarry - SRA 10.6 MB (PDF document)
- RFI Response Email (1) 464.0 KB (Microsoft Word Document)
- RFI Response Email (2) 12.7 MB (Microsoft Word Document)
- RFI Response HA Continuing Competence 16-4-2021 - 17 Apr 2021 - 10-00 629.7 KB (PDF document)
- RFI Response Henry Austin - CoTC certificates 1.1 MB (PDF document)
- RFI Response Henry Austin- CC cert 2019 5.3 MB (PDF document)
- RFI Response PART A 791.7 KB (PDF document)
- RFI Response PART B2 372.3 KB (PDF document)
- RFI Response PART B4 855.7 KB (PDF document)
- RFI Response PART F1 879.4 KB (PDF document)
Audiences
- Anyone from any background
Interests
- Waste
- Environmental permitting
Share