ME15 6RQ, P. J. Burke Properties Limited, EPR/JB3509FR/A001: environmental permit consultation
Closed 13 Dec 2021
Opened 15 Nov 2021
Overview
We are seeking your comments on an environmental permit application received from P. J. Burke Properties Limited for
Tovil Quarry
Land Off Farleigh Hill
Maidstone
Kent
ME15 6RQ
We can take account of
- Relevant environmental regulatory requirements and technical standards.
- Information on local population and sensitive sites.
- Comments on whether the right process is being used for the activity, for example whether the technology is the right one.
- The shape and use of the land around the site in terms of its potential impact, whether that impact is acceptable and what pollution control or abatement may be required.
- The impact of noise and odour from traffic on site.
- Permit conditions by providing information that we have not been made aware of in the application, or by correcting incorrect information in the application (e.g. monitoring and techniques to control pollution).
We cannot take account of
- Issues beyond those in the relevant environmental regulations.
- Anything outside the remit of the EPR, e.g. the proposed location of the site, which is done by the local authority via land use planning.
- Whether a site should have a formal designation under Habitats Directive or other conservation legislation.
- Whether the activity should be allowed or not as a matter of principle. For example we will not consider whether wood, gas, or coal should be burnt to produce electricity; only that the options and environmental impact of say wood has been considered. We will not consider whether a waste incinerator proposal should be turned into a sorting and recycle proposal, only that the incinerator options and effect have been considered.
- Land use issues when determining a permit application, even if changing the location of the activity would improve its environmental performance.
- The impact of noise and odour from traffic travelling to and from the site.
- The legally defined process we follow to determine a permit.
- The granting of a permit/variation if the operator is able to demonstrate that they can carry out the activity without significant risk to the environment or human health.
Related
- Environmental Permit Application Privacy Notice.pdf 102.6 KB (PDF document)
- About this consultation.pdf 94.7 KB (PDF document)
- Application - bespoke - Non technical summary 11767817.pdf 105.7 KB (PDF document)
- Form Part A 11767788.pdf 795.3 KB (PDF document)
- Form Part B2 - Redacted 11767791.pdf 198.6 KB (PDF document)
- Form Part B4 11767799.pdf 852.4 KB (PDF document)
- Application Bespoke - Tovil Quarry_Application Form Part B4_September 2021 Update 15.09.2021.pdf 862.4 KB (PDF document)
- Form Part F1 11767801.pdf 895.8 KB (PDF document)
- Site Plan T3 11768056.pdf 166.3 KB (PDF document)
- Site Plans and Layouts - Cut and Fill Analysis Plan 11767827.pdf 1.4 MB (PDF document)
- Site Plans and Layouts - Phased Fill Cross Sections 11767832.pdf 601.4 KB (PDF document)
- Site Plans and Layouts - Proposed Housing Development Plan 11767834.pdf 629.9 KB (PDF document)
- Site Plans and Layouts - Site Development Cross Section Plan 11767836.pdf 2.9 MB (PDF document)
- Site Plans and Layouts - Site Development Plan 11767840.pdf 1.5 MB (PDF document)
- Site Plans and Layouts - Site plan including Cut and Fill Summary 11767841.pdf 1.4 MB (PDF document)
- Site Plans and Layouts - tovil Phase 1 with permit boundary 11767844.pdf 6.8 MB (PDF document)
- Site Plans and Layouts - tovil Phase 2 with permit boundary 11767847.pdf 4.2 MB (PDF document)
- Site Plans and Layouts - tovil Phase3 with permit boundary 11767850.pdf 4.4 MB (PDF document)
- Site Plans and Layouts - Tovil Quarry_Proposed Permit Boundary 11767852.pdf 251.9 KB (PDF document)
- Site Plans and Layouts - Tovil_Materials Processing Area 11767853.pdf 1.2 MB (PDF document)
- Waste Recovery Plan - Appendix A - Site plans 11767925.pdf 2.3 MB (PDF document)
- Application Bespoke - Tovil Quarry_Proposed Permit Boundary 15.09.2021.pdf 413.4 KB (PDF document)
- Appendix E - B - 19-17595.0 11767895.xls 672.4 KB (Excel spreadsheet)
- Appendix E - B - 19-17595.1 11767899.xls 672.4 KB (Excel spreadsheet)
- Appendix E - B - 19-17677.1 11767902.xls 358.7 KB (Excel spreadsheet)
- Appendix E - B - 20-00051.1 11767908.xls 143.7 KB (Excel spreadsheet)
- Appendix E - B - 20-00060.1 11767913.xls 141.9 KB (Excel spreadsheet)
- Appendix H - TP & BH Log and Monitoring - 19-17595.0 11767989.xls 672.4 KB (Excel spreadsheet)
- Appendix H - TP & BH Log and Monitoring - 19-17595.1 11767990.xls 672.4 KB (Excel spreadsheet)
- Appendix H - TP & BH Log and Monitoring - 19-17677.1 11767994.xls 358.7 KB (Excel spreadsheet)
- Appendix H - TP & BH Log and Monitoring - 20-00051.1 11767997.xls 143.7 KB (Excel spreadsheet)
- Appendix H - TP & BH Log and Monitoring - 20-00060.1 11767999.xls 141.9 KB (Excel spreadsheet)
- Appendix H - TP & BH Log and MonitoringP & BH Log and Monitoring Data 11768002.pdf 8.9 MB (PDF document)
- Appendix K - Southern Testing 2004 Boreh 11768006.pdf 2.0 MB (PDF document)
- Application Bespoke - 210914_R_JER1656_TC_Dust Management Plan 15.09.2021.pdf 325.3 KB (PDF document)
- Application Bespoke - 210915_L_JER1656_TC_Further Information Response Letter 15.09.2021.pdf 250.7 KB (PDF document)
- Dust and Particulates Management Plan 11768031.pdf 61.3 KB (PDF document)
- Environmental Risk Assessment - Cut and Fill Analysis Plan 11767859.pdf 1.4 MB (PDF document)
- Environmental Risk Assessment - Tovil Quarry_Proposed Permit Boundary 11767860.pdf 251.9 KB (PDF document)
- Environmental Risk Assessment 11768035.pdf 113.9 KB (PDF document)
- Environmental Risk Assessment_V2R1 11767855.pdf 841.4 KB (PDF document)
- ESSD - EA Planning Letter 11767868.pdf 123.9 KB (PDF document)
- ESSD - Pre-Application Charged Advice Letter 11767876.pdf 81.5 KB (PDF document)
- ESSD - Tovil Quarry Remedation Strategy 11767878.pdf 618.9 KB (PDF document)
- ESSD 11767863.pdf 1.4 MB (PDF document)
- Ground Gas Management Plan 11768014.pdf 3.5 MB (PDF document)
- Mobile Plant EMS Documents - Conceptual Site Model 11768028.pdf 131.5 KB (PDF document)
- Mobile Plant EMS Documents - Monitoring Plan 11768044.pdf 121.4 KB (PDF document)
- Monitoring Locations Plan T2 11768037.pdf 139.4 KB (PDF document)
- Odour Management Plan 11768053.pdf 63.0 KB (PDF document)
- Supporting Information V2Rev1 11767819.pdf 2.7 MB (PDF document)
- Topographical Survey 11768018.pdf 984.0 KB (PDF document)
- TP & BH Log and Monitoring Data 11767918.pdf 8.9 MB (PDF document)
- Waste Acceptance Procedures 11767881.pdf 287.0 KB (PDF document)
- Waste Acceptance ProceduresEA Planning Letter 11767885.pdf 123.9 KB (PDF document)
- Waste Acceptance ProceduresEA Pre-Application Charged Advice Letter 11767889.pdf 81.5 KB (PDF document)
- Waste Acceptance ProceduresEmail from Nina Reader_Regulatory Officer 11767893.pdf 112.0 KB (PDF document)
- Waste Recovery Plan - Appendix B - Proposed Development Plans 11767929.pdf 4.4 MB (PDF document)
- Waste Recovery Plan - Appendix C - Areas and Stockpile Charact 11767970.pdf 17.3 MB (PDF document)
- Waste Recovery Plan - Appendix C - Areas and Stockpile Charact 11767970.pdf 17.3 MB (PDF document)
- Waste Recovery Plan - Appendix D - Earthworks Specification 11767975.pdf 3.2 MB (PDF document)
- Waste Recovery Plan - Appendix E - Remediation Strategy 11767978.pdf 618.9 KB (PDF document)
- Waste Recovery Plan - Appendix F - Reclamation Method Statement 11767983.pdf 7.7 MB (PDF document)
- Waste Recovery Plan - Appendix G - Materials Management Plan 11767986.pdf 7.2 MB (PDF document)
- Waste Recovery Plan V5 R1 11767921.pdf 2.7 MB (PDF document)
- Noise Management Plan 11768047.pdf 59.6 KB (PDF document)
- Noise Risk Assessment 11768052.pdf 62.8 KB (PDF document)
Audiences
- Anyone from any background
Interests
- Waste
- Environmental permitting
Share
Share on Twitter Share on Facebook