CH65 4HB, Essar Oil (UK) Limited, EPR/FP3139FN/V013: environmental permit consultation on additional information
Closed 27 Jan 2023
Opened 29 Dec 2022
Overview
We are seeking your comments on additional documents received for an environmental permit application received from Essar Oil (UK) Limited for
P O Box 3
Ellesmere Port
Merseyside
CH65 4HB
We can take account of
- Relevant environmental regulatory requirements and technical standards.
- Information on local population and sensitive sites.
- Comments on whether the right process is being used for the activity, for example whether the technology is the right one.
- The shape and use of the land around the site in terms of its potential impact, whether that impact is acceptable and what pollution control or abatement may be required.
- The impact of noise and odour from traffic on site.
- Permit conditions by providing information that we have not been made aware of in the application, or by correcting incorrect information in the application (e.g. monitoring and techniques to control pollution).
We cannot take account of
- Issues beyond those in the relevant environmental regulations.
- Anything outside the remit of the EPR, e.g. the proposed location of the site, which is done by the local authority via land use planning.
- Whether a site should have a formal designation under Habitats Directive or other conservation legislation.
- Whether the activity should be allowed or not as a matter of principle. For example we will not consider whether wood, gas, or coal should be burnt to produce electricity; only that the options and environmental impact of say wood has been considered. We will not consider whether a waste incinerator proposal should be turned into a sorting and recycle proposal, only that the incinerator options and effect have been considered.
- Land use issues when determining a permit application, even if changing the location of the activity would improve its environmental performance.
- The impact of noise and odour from traffic travelling to and from the site.
- The legally defined process we follow to determine a permit.
- The granting of a permit/variation if the operator is able to demonstrate that they can carry out the activity without significant risk to the environment or human health.
Related
- Privacy Notice 102.6 KB (PDF document)
- About this consultation 111.4 KB (PDF document)
- EOUKL Response to Schedule 5 Q19 839.9 KB (PDF document)
- H1TOOL_2.78 for methanol emissions from TEG vent 1.5 MB (Zip archive)
- Interim incomplete response to Schedule 5_1 question 22abc 1.1 MB (Microsoft Word Document)
- Response to Q19 Schedule 5 Notice - Risk assessment for CO2 venting emissions - Air dispersion modelling files 36.6 KB (Zip archive)
- Response to Q19 Schedule 5 Notice - Risk assessment for CO2 venting emissions - Appendix 1. CO2 vent summary 628.7 KB (PDF document)
- Response to Q19 Schedule 5 Notice - Risk assessment for CO2 venting emissions - Appendix 2. FM1383_Essar_CERC_R3 - 1.7 MB (PDF document)
- Response to Q19 Schedule 5 Notice - Risk assessment for CO2 venting emissions - Appendix 3. Methodology 262.7 KB (PDF document)
- Response to Schedule 5 Notice - Nois Impact Assessment - Doc. 5194812-000-46DP01-4-0003-13 Rev 04 - 1.2 MB (PDF document)
- Response to Schedule 5 Notice - Noise Impact Assessment - Document 5194812-000-46DP01-4-0003-12 Rev 04 - 843.5 KB (PDF document)
- Response to Schedule 5 Notice - Noise Survey Summary 1.2 MB (Office Excel 2007 XML workbook)
- Response to Schedule 5 Notice - Sound Power Data 40.3 KB (Office Excel 2007 XML workbook)
- Response to Schedule 5 Notice 1 - Noise Impact Assessment 2.9 MB (PDF document)
- Schedule 5 Response - 5d 5194812-000-45ED-4-0003_03 Feed Fired Heater - 930.6 KB (PDF document)
- Schedule 5 Response - 5e 5194812-000-45ED-4-0013_03 Boiler Datasheet - 911.0 KB (PDF document)
- Schedule 5 Response - 11b Attachment - 380.1 KB (PDF document)
- Schedule 5 Response - 13b Attachments 734.2 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 1abc - 740.6 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 2a - 428.1 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 2b - 391.4 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 2c - 829.4 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 2d - 393.0 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 2e 455.5 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 2f 270.6 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 2g - 433.2 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 3 277.0 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 4a 611.0 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 4b 682.0 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 4c 812.0 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 5a 372.2 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 5b 389.1 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 5ci - 443.1 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 5cii 440.3 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 5d 513.8 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 5e 460.2 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 6a 368.6 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 7a 368.3 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 8a 418.7 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 8b 465.4 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 9a 507.9 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 9b 411.0 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 9ci 384.5 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 9cii 372.7 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 9ciii 412.6 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 9civ 401.8 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 9d 738.3 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 9e 378.4 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 9ei 272.9 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 9eii 379.5 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 9eiii 551.1 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 9f 272.9 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 9gi 371.0 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 9gii 389.0 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 9h (i ii iii) 464.3 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 10a 928.0 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 11a 411.8 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 11b 425.2 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 12b 298.0 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 12c 281.4 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 13a 440.1 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 13b 376.3 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 13c 616.3 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 14a 382.4 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 14b 372.3 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 14c 380.9 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 14d 407.3 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 15a 529.9 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 15b 463.2 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 16 487.0 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 17a 609.3 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 18a 715.0 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 19a 797.8 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 19c 698.9 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 20a 558.4 KB (PDF document)
- Schedule 5 Response - Hynet HPP Schedule 5 answers - EPR Schedule 5 - 21 352.0 KB (PDF document)
- Response to Schedule 5 Notice 1 - Additional information - Clarification - items 1-8 394.3 KB (PDF document)
- Response to Schedule 5 Notice 1 - Additional information - clarification Item 1 - attachment 1 1.3 MB (PDF document)