BN18 0HY, Ford Energy from Waste Limited, EPR/MP3904BD/A001: environmental permit consultation, withdrawn

Closed 23 Jun 2021

Opened 12 May 2021

Published responses

View submitted responses where consent has been given to publish the response.

Overview

On 26 November 2021, we were notified by Ford Energy from Waste Limited that that they wish to withdraw this application and therefore we will no longer be determining this environmental permit, refer to briefing note number 5.

Withdrawing a permit application does not mean that they cannot re-apply to us at a later stage. They have also withdrawn their related planning application Plans for Ford Circular Technology Park withdrawn

We did seek your comments on an environmental permit application received from Ford Energy from Waste Limited for

Ford Circular Technology Park
Ford Airfield Industrial Estate
Ford
Arundel
West Sussex
BN18 0HY

We can take account of

  • Relevant environmental regulatory requirements and technical standards.
  • Information on local population and sensitive sites.
  • Comments on whether the right process is being used for the activity, for example whether the technology is the right one.
  • The shape and use of the land around the site in terms of its potential impact, whether that impact is acceptable and what pollution control or abatement may be required.
  • The impact of noise and odour from traffic on site.
  • Permit conditions by providing information that we have not been made aware of in the application, or by correcting incorrect information in the application (e.g. monitoring and techniques to control pollution).

We cannot take account of

  • Issues beyond those in the relevant environmental regulations.
  • Anything outside the remit of the EPR, e.g. the proposed location of the site, which is done by the local authority via land use planning.
  • Whether a site should have a formal designation under Habitats Directive or other conservation legislation.
  • Whether the activity should be allowed or not as a matter of principle. For example we will not consider whether wood, gas, or coal should be burnt to produce electricity; only that the options and environmental impact of say wood has been considered. We will not consider whether a waste incinerator proposal should be turned into a sorting and recycle proposal, only that the incinerator options and effect have been considered.
  • Land use issues when determining a permit application, even if changing the location of the activity would improve its environmental performance.
  • The impact of noise and odour from traffic travelling to and from the site.
  • The legally defined process we follow to determine a permit.
  • The granting of a permit/variation if the operator is able to demonstrate that they can carry out the activity without significant risk to the environment or human health.

 

 

Audiences

  • Anyone from any background

Interests

  • Environmental permitting
  • Installation