Through the Alconbury Brook Flood Alleviation Scheme, we are developing a way forward to reduce the risk of flooding from the Alconbury Brook in Alconbury and Alconbury Weston.
Flooding in Hamerton Road, Alconbury Weston, January 2021
Background to the scheme
The Alconbury Brook catchment is relatively ‘flashy’ in comparison to the wider River Great Ouse catchment, meaning that is reacts quickly to rainfall and the onset of flooding can be rapid.
Both Alconbury and Alconbury Weston have an extensive history of flooding, notably in 1998 when, unfortunately, more than 100 properties flooded across both villages, and in winter 2020/21 when over 75 properties were flooded.
Records also indicate that properties have flooded in March 1947, July 1968, October 1987, November 2000, and March 2016.
Alconbury Weston flooding, Easter 1998
There are currently no formal flood defences in Alconbury or Alconbury Weston. Our previous studies to develop a flood alleviation scheme for the villages have been unsuccessful in identifying viable options. These either had an unacceptable impact on village aesthetics or, based on the costs and benefits of a scheme, were unable to be eligible for government Grant in Aid (GiA) funding.
We are reviewing options for a flood alleviation scheme, with the aim to identify a technically and economically viable scheme that will reduce the risk of flooding to the villages. The introduction of the Partnership Funding approach for flood risk management projects since the previous Alconbury study means that the project is now more likely to be eligible for a contribution from GiA funding, but will require additional contributions from partners.
What’s happened so far, engagement, and next steps
Working with our consultant (Jacobs), we reviewed previous project appraisals and identified new options to develop a long list of potential flood alleviation scheme options.
We’ve been working closely with the Alconburys Flood Group, as well as other stakeholders including Cambridgeshire County Council and the Bedford Group of Internal Drainage Boards to help us develop the scheme. Their input has been hugely valuable in building our knowledge of past flooding events and impacts. The Flood Group members reviewed our initial set of scheme options to reduce flood risk, and their feedback helped us to refine those on the shortlist.
Keen to hear feedback from the wider community, we held a public drop-in event on 14 June 2022, attended by over 80 people. We also ran an online survey for people to give us their comments and feedback on the shortlisted options.
Our initial shortlist of options
The shortlist is based on initial findings and a very high level of analysis. If the scheme progresses to a more detailed assessment, which will include hydraulic modelling, there is a possibility that this may rule out some of the options. At this stage it’s important that we identify a potentially viable scheme that can be included within Strategic Outline Case. Where options could be combined or undertaken as supplementary options to a ‘main’ option, this would also be investigated at the next stage.
The shortlist is split into 2 sections:
Following June’s community drop in event, we have been reviewing the feedback received both on the day and via the project web page. In total, we received 49 pieces of feedback (16 on the day, 33 via the project web page).
Feedback on the shortlisted options
Of the shortlisted options presented:
Feedback on the complementary options
The feedback indicates the popularity of each option as follows (most to least popular):
It’s important to stress that the complementary options are those that we believe could have some benefit, but they will need to be undertaken in combination with other options. They will not be considered in isolation.
What happens next?
Based on the feedback received, these shortlisted options will be taken forward:
We’ll now undertake an economic assessment for these options to better understand their economic viability. If a viable option is identified, this will be included in a Strategic Outline Case for us to seek to obtain funding for the next stage of the project.
We will investigate whether options can be combined or undertaken as supplementary options to a ‘main’ option at the next stage of the project. Based on the feedback received, all the complementary options remain ‘on the table’ and we will factor in preferences on these when scheme options are developed and refined.
We’ll share further project updates on this web page as we further develop the options. We’ll also continue to share updates with the Flood Group for their newsletter.
Alconbury Brook Natural Flood Management Project
NFM project at LWS Milton Estate (Rectory Farm)
The Alconbury Brook Natural Flood Management (NFM) Project is part of a £15 million national pilot NFM fund launched by the government to determine the effectiveness of NFM solutions in different catchments. It has been running since 2018 and is due to be completed this year. It is a partnership between Natural England’s Countryside Stewardship Scheme and the Environment Agency.
NFM measures can not only help to reduce flood risk, but also improve water quality and habitats by working with natural processes and utilising soft engineering techniques.
NFM measures installed include:
New monitoring stations were installed which will help to provide evidence of the effectiveness of existing and future NFM measures in reducing flood risk and improving water quality. The success of this project, and considerable engagement with landowners and farmers in the catchment, has resulted in a long-term future for NFM in the catchment. We are now working closely with the Alconburys Flood Group who are keen to develop NFM more widely in the catchment, by building on the farmer and landowner engagement undertaken by this project. This will ensure that a truly collaborative approach is taken to NFM and nature recovery in the catchment.
Our flood risk maintenance work
We have spent £147,000 on maintenance in Alconbury since April 2016. The banks of the Alconbury Brook are inspected annually, and the channel is checked for significant blockages and vegetation growth. This inspection is used to plan our maintenance programme. We also respond to reports of blockages, such as fallen trees, and remove them where they present an increased flood risk.
A selective in-channel weed spray and grass cut of the channel sides through Alconbury and Alconbury Weston is undertaken each year, as well as maintaining and repairing Garkies Mill Sluice at the far downstream end of Alconbury Brook.
Being prepared for flooding
There is lots you can do to prepare for flooding and to try and minimise the impact it can have on you, your community and property.
Check if your area is at risk of flooding
Sign up to flood warnings
You can sign up to the Environment Agency's free flood warning service which will send you alerts if flooding is predicted in your local area. This will give you a warning so you can prepare your home or business for potential flooding.
Get home insurance
Make sure you have the correct home insurance cover in case your property floods. The cost of recovery after a flood is on average £20,000. The Flood Re website has been set up to help those who live in a flood risk area find affordable home insurance.
Create a personal flood plan
The personal flood plan includes a list of things you should do and provides space for you to note down important contact details such as your utility companies and insurance. The Environment Agency has created a personal flood plan template you can use.
Flood protection products
There are many different types of equipment you can purchase which will offer different levels of protection to your home in the event of a flood. The National Flood Forum has produced an independent directory of flood protection products and services called the Blue Pages.
Keep your drains and grids clear
Removing leaves and debris that are covering the top of your grids will help prevent blockages which could cause localised flooding in heavy rainfall.
If you own property next to a water course for example a river, culvert, brook, or mill stream, it's your responsibility to keep the bed and banks clear of anything that could cause an obstruction and increase flood risk. Find about your rights and responsibilities of riverside ownership.
We'll add further information to this web page as the scheme develops. If you have any questions, please do get in touch with our project team.