Find activities

382 results

  • NN7 4EJ, Mick George Limited, EPR/QP3121SY/A001: environmental permit consultation

    We are seeking your comments on an environmental permit application received from Mick George Limited for Harlestone Inert Landfill Harlestone Road Northampton NN7 4EJ We can take account of Relevant environmental regulatory requirements and technical standards. Information on local population and sensitive sites. Comments on whether the right process is being used for the activity,... More
    Opened 21 July 2025
  • EX5 1EW, Suez Recycling and Recovery UK Ltd, EPR/AP3897LG/V005: environmental permit consultation

    We are seeking your comments on an environmental permit application received from Suez Recycling and Recovery UK Ltd for East Devon Waste Transfer Station Greendale Business Park Exeter EX5 1EW We can take account of Relevant environmental regulatory requirements and technical standards. Information on local population and sensitive sites. Comments on whether the right... More
    Opened 22 July 2025
  • RM18 7EQ, GAP Group Limited, EPR/RP3027SK/A001: environmental permit consultation

    We are seeking your comments on an environmental permit application received from GAP Group Limited for: GAP Group Limited Dock Road Tilbury Thurrock Essex RM18 7EQ We can take account of • Relevant environmental regulatory requirements and technical standards. • Information on local population and sensitive sites. • Comments on whether the right process is being used for the activity, for example whether the technology is the right one. • The... More
    Opened 25 June 2025
  • Lydd Ranges Sea Defences Scheme - Timeline

    The site compound is located within the Environment Agency’s existing compound at Jury’s Gap. We have also established a satellite compound at South Brooks, which will reduce some of the activity that otherwise would have taken place at Jury’s Gap. We will be starting works on the beach in summer 2021. Please see the map below which shows the key works for each year: 2021: works between Jury’s Gap and South Brooks (groynes, Green Wall, beach... More
    Opened 21 July 2021
  • Lydd Ranges Sea Defences Scheme - Why do we need the scheme?

    The  Lydd Ranges frontage extends from Jury’s Gap near Camber in East Sussex and extends eastwards for approximately 8.2km to Dungeness nuclear power station, Kent. The Folkestone to Cliff End Strategy (FoCES) reports 600 properties at risk of flooding from a 0.5% AEP event by 2108. 30 properties would be immediately at-risk, post breach (failure) of the defences. The Lydd Ranges and infrastructure would also be at risk. The site is a premier live firing... More
    Opened 21 July 2021
  • Lydd Ranges Sea Defences Scheme - Upcoming works

    May 2023 update Shortly, we will be resuming works on the Lydd Ranges Sea Defences Scheme. We expect the scheme to be complete at the end of 2023. The works we will complete this year and timings are summarised in the table below. The majority of the works are continuations of works from the previous years, using similar equipment and methodology, with two exceptions: This year, some rock will be moved by lorry to planned works in Shoreham, Sussex. This will... More
    Opened 21 July 2021
  • Lydd Ranges Sea Defences Scheme - Environment

    The  Lydd Ranges frontage extends eastwards from Jury’s Gap near Camber in East Sussex and for approximately 8.2km to Dungeness nuclear power station, Kent. The area within and surrounding the Lydd Ranges frontage is of high nature conservation value. This is reflected in the extensive statutory designations that are present throughout the study area, including: Dungeness Special Area of Conservation (SAC) Dungeness, Romney Marsh and Rye... More
    Opened 21 July 2021
  • Lydd Ranges Sea Defences Scheme - Gallery

    November 2021: The groyne installation progress and finished works for the year. The barge taking shingle to the beach as part of the interim beach nourishment. Work gets underway on the Lydd Ranges Scheme The first groyne pile going in at Lydd Ranges. The Green Wall track looking west from the Jury’s Gap compound. Timber groynes will be instated to stabilise the beach and new beach... More
    Opened 21 July 2021
382 results. Page 13 of 13