DN15 0DB, Egdon Resources UK Limited, EPR/AB3609XX/V007: environmental permit consultation
Closed 30 Dec 2024
Opened 28 Nov 2024
Overview
We are seeking your comments on an environmental permit application received from Egdon Resources UK Limited for:
Wressle 1
Clapp Gate
Scunthorpe
North Lincolnshire
DN15 0DB
We can take account of
- Relevant environmental regulatory requirements and technical standards.
- Information on local population and sensitive sites.
- Comments on whether the right process is being used for the activity, for example whether the technology is the right one.
- The shape and use of the land around the site in terms of its potential impact, whether that impact is acceptable and what pollution control or abatement may be required.
- The impact of noise and odour from traffic on site.
- Permit conditions by providing information that we have not been made aware of in the application, or by correcting incorrect information in the application (e.g. monitoring and techniques to control pollution).
We cannot take account of
- Issues beyond those in the relevant environmental regulations.
- Anything outside the remit of the EPR, e.g. the proposed location of the site, which is done by the local authority via land use planning.
- Whether a site should have a formal designation under Habitats Directive or other conservation legislation.
- Whether the activity should be allowed or not as a matter of principle. For example we will not consider whether wood, gas, or coal should be burnt to produce electricity; only that the options and environmental impact of say wood has been considered. We will not consider whether a waste incinerator proposal should be turned into a sorting and recycle proposal, only that the incinerator options and effect have been considered.
- Land use issues when determining a permit application, even if changing the location of the activity would improve its environmental performance.
- The impact of noise and odour from traffic travelling to and from the site.
- The legally defined process we follow to determine a permit.
- The granting of a permit/variation if the operator is able to demonstrate that they can carry out the activity without significant risk to the environment or human health.
Related
- Environmental Permit Application Privacy Notice 102.6 KB (PDF document)
- About this consultation 112.7 KB (PDF document)
- 01 - Cover Document 697.7 KB (PDF document)
- Application Form Part A 832.6 KB (PDF document)
- Application Form Part C2 1.2 MB (PDF document)
- Application Form Part C3 691.6 KB (PDF document)
- Application Form Part C5 401.4 KB (PDF document)
- Application Form Part Part C6 - Varying a Bespoke Water Discharge Activity Permit HFF 1.1 MB (PDF document)
- Application Form Part Part C6 - Varying a Bespoke Water Discharge Activity Permit SW 1.1 MB (PDF document)
- Application Form Part Part F1 569.4 KB (PDF document)
- 02A - Application Forms - Supplementary Information 700.3 KB (PDF document)
- 02B - Application Forms - Application Checklist 219.7 KB (PDF document)
- 03 - Non Technical Summary 1.2 MB (PDF document)
- 04 - Site Plans 683.8 KB (PDF document)
- 05 - Waste Management Plan 1.6 MB (PDF document)
- 06 - Site Condition Report 2.3 MB (PDF document)
- 07 - Environmental Risk Assessment 659.6 KB (PDF document)
- 07a - Environmental Risk Assessment 732.6 KB (PDF document)
- 08 - RPT Wressle-23 HRA-FRA 14.1 MB (PDF document)
- 09 - Appendix 1 - W2 and W3 Well Schematics 46.3 KB (PDF document)
- 09 - Appendix 2 - W1, W2 & W3 Well Paths 232.8 KB (PDF document)
- 09 - Appendix 3 - Chemical Inventory 603.0 KB (PDF document)
- 09 - Appendix 4 - Wressle 1 - JAGDAG Assessment 467.6 KB (PDF document)
- 09 - CIWS 661.7 KB (PDF document)
- 10 - Appendix 1 - Indicative Point Source Emissions Plan 500 Scale A2 2.8 MB (PDF document)
- 10 - Appendix 2 - Long List of Technologies 498.6 KB (PDF document)
- 10 - Appendix 3 - Cost Benefit Analysis (Engine vs Turbine) 530.4 KB (PDF document)
- 10 - Appendix 4 - Gas Sample Analysis 129.2 KB (PDF document)
- 10 - Gas Sample - October 2021 129.2 KB (PDF document)
- 10 - Waste Gas Management Plan 1.3 MB (PDF document)
- 11 - LSW231043 Egdon Resources UK Limited, Wressle wellsite - Air quality impact assessment- Issue 5 3.7 MB (PDF document)
- 12 - 23150 Noise Modelling Files for the EA 1.0 MB (Zip archive)
- 12 - Wressle Oilfield Development Project - Noise Impact Assessment - Techical Note re Compressor 164.5 KB (PDF document)
- 12 - Wressle Oilfield Development Project - Noise Impact Assessment - V3 19.1 MB (PDF document)
- 13 - Best Available Technique Signposting Document 706.5 KB (PDF document)
- 14 - Surface Water Management Plan rev 1 April 2024 2.3 MB (PDF document)
- 15 - Environmental Management System Overview rev 4 116.2 KB (PDF document)
- 15 - HSE Policy (Rev 6) November 2022 91.8 KB (PDF document)
- 15 - Waste Management rev 5 253.8 KB (PDF document)
- 16 - Construction Quality Assurance Plan 1.8 MB (PDF document)
- Appendix 1 - Air Quality Monitoring 2024 3.7 MB (PDF document)
- Appendix 2a - Groundwater and Surface Water Monitoring Results December 2023 8.8 MB (PDF document)
- Appendix 2b - Surface Water Report 2015 80.2 KB (PDF document)
- Appendix 3 - Ground Investigation Report 1.5 MB (PDF document)
- Appendix 4 - Radiological Survey and Monitoring Results 1.4 MB (PDF document)
- ZG-ER-EPR-W2-SP-004-01 Location Plan 10000 Scale A3 453.1 KB (PDF document)
- ZG-ER-EPR-W2-SP-004-02 Location Plan 2500 Scale A2 256.6 KB (PDF document)
- ZG-ER-EPR-W2-SP-004-03 Site Layout Plan - Existing Site 500 Scale A2 2.8 MB (PDF document)
- ZG-ER-EPR-W2-SP-004-04 Indicative Site Layout Plan - Construction Phase 500 Scale A2 2.8 MB (PDF document)
- ZG-ER-EPR-W2-SP-004-05 Indicative Site Layout Plan - Drilling Phase 500 Scale A2 2.8 MB (PDF document)
- ZG-ER-EPR-W2-SP-004-06 Indicative Site Layout Plan - Workover Phase 500 Scale A2 2.8 MB (PDF document)
- ZG-ER-EPR-W2-SP-004-07 Indicative Site Layout Plan - Proppant Squeeze Phase 500 Scale A2 2.8 MB (PDF document)
- ZG-ER-EPR-W2-SP-004-08 Indicative Layout Plan - Enhanced Production Phase 500 Scale A2 2.8 MB (PDF document)
- ZG-ER-EPR-W2-SP-004-09 Indicative Site Layout Plan - Enhanced Production & Gas to Grid Phase 500 Scale A2 2.8 MB (PDF document)
- ZG-ER-EPR-W2-SP-004-10 Indicative Point Source Emissions Plan 500 Scale A2 2.8 MB (PDF document)
- ZG-ER-EPR-W2-SP-004-11 Extent of Mining Waste Facility Plan 10000 Scale A3 586.9 KB (PDF document)
- Safety Data Sheets 32.7 MB (Zip archive)
- NDM RFI response 11 AQIA EDG A 2020.APL 19.7 KB (Octet Stream)
- NDM RFI response 11 AQIA EDG B 2017.APL 19.7 KB (Octet Stream)
- NDM RFI response 12 NIA Excel files Copy of 2250-1 NML 1 16.08.24 att 3 11.3 MB (Office Excel 2007 XML workbook)
- NDM RFI response 12 NIA Excel files Copy of 2250-2 NML 2 16.08.24 att 3 11.2 MB (Office Excel 2007 XML workbook)
- NDM RFI response 12 NIA Excel files Weather data 16.08.24 att 3 227.6 KB (text/comma-separated-values)
- NDM RFI Response Completed Form C3 24.09.24 950.0 KB (Microsoft Word Document)
- NDM RFI response drop box 3.09.24 222.0 KB (Microsoft Word Document)
- NDM RFI response re excel files 16.08.24 238.0 KB (Microsoft Word Document)
- NDM RFI Response Completed Form C3 24.09.24 950.0 KB (Microsoft Word Document)
- NDM RFI response Part C3 Completed 24.09.24 att 1 871.1 KB (PDF document)
Audiences
- Anyone from any background
Interests
- Waste
- Environmental permitting
- Installation
Share
Share on Twitter Share on Facebook