Open Consultations and Information Pages

128 results

  • Ventnor Coastal Protection and Slope Stabilisation Scheme Information Page

    Ventnor undercliff – Ventnor town has been developed on terraces created by relic landslides Welcome to the Ventnor Coastal Protection and Slope Stabilisation Scheme Information Page. The Environment Agency have created this page to provide easy access to information on the Ventnor project, one of four priority coastal defence projects on the Isle of Wight. The Environment Agency will be updating this site as the project progresses, so please keep checking... More
    Opened 27 January 2022
  • Embankment Road (Bembridge) Coastal Defence Scheme Information Page

    Welcome to the Embankment Road (Bembridge) Coastal Defence Scheme Information Page. The Environment Agency have created this page to provide easy access to information on the Embankment Road (Bembridge) project, one of four priority coastal defence projects on the Isle of Wight. The Environment Agency will be updating this site as the project progresses, so please keep checking for what's new. If you would like to be added to our mailing list to receive updates on this... More
    Opened 27 January 2022
  • Greyfriars Community Flood Scheme

    Page created 15 December 2021, last updated 20 January 2025. 20 January 2025 Please see our latest update for 20 January 2025 Flooding in Hereford Hereford is subject to significant flood risk from the River Wye and has flooded a number of times. The most significant flood events have been in 1960, 1979, 1998, 2002, 2004, 2012, 2019, 2020 and 2021. In 2008 a Flood Risk Management Scheme was completed for the... More
    Opened 15 November 2021
  • East Cowes Flood Risk Management Scheme Information Page

    Welcome to the East Cowes Flood Risk Management Scheme Information Page. We have created this page to provide easy access to information on the East Cowes Flood Risk Management Scheme, one of a number of coastal defence projects on the Isle of Wight. We will be updating this site as the project progresses, so please keep checking for what’s new. If you would like to be added to our mailing list to receive updates on this project or any other of the Isle of Wight... More
    Opened 8 November 2021
  • Colwick (Holme Sluices) Fish Pass Information Page

    February 2024 Jackson Civil Engineering are working on behalf of the Environment Agency. Construction of the fish pass will help to create a healthy watercourse, allowing migratory fish to access spawning grounds upstream, provide better wildlife habitats, and improve the biodiversity of the area”. When the gate is closed there is still a residual flow through the eel chute, as eels will travel against the direction of flow and tolerate very low water levels, this... More
    Opened 20 September 2021
  • Gadebridge Park river restoration information page

    We're working with Dacorum Borough Council and Affinity Water to restore the River Gade at Gadebridge Park, a globally rare and valuable chalk stream. The project will provide multiple benefits, including improved habitats for wildlife, better resilience to low flows and the impacts of climate change, reduced pooling of flood water in the park, and allowing local residents and visitors to get closer to the river and enjoy nature. Our project will improve the river in the... More
    Opened 10 September 2021
  • River Idle

    This information page provides an overview of the River Idle, its history, our current understanding and work, legislation, future work and investigations. Please use the Fact Banks below to find the sections relevant for you.  Geography of the area The River Idle is a 30 mile long river in Nottinghamshire. It begins at the confluence of the River Maun and River Meden, near Markham Moor. From there, it flows north... More
    Opened 24 August 2021
  • Lydd Ranges Sea Defences Scheme - Timeline

    The site compound is located within the Environment Agency’s existing compound at Jury’s Gap. We have also established a satellite compound at South Brooks, which will reduce some of the activity that otherwise would have taken place at Jury’s Gap. We will be starting works on the beach in summer 2021. Please see the map below which shows the key works for each year: 2021: works between Jury’s Gap and South Brooks (groynes, Green Wall, beach... More
    Opened 21 July 2021
  • Lydd Ranges Sea Defences Scheme - Why do we need the scheme?

    The  Lydd Ranges frontage extends from Jury’s Gap near Camber in East Sussex and extends eastwards for approximately 8.2km to Dungeness nuclear power station, Kent. The Folkestone to Cliff End Strategy (FoCES) reports 600 properties at risk of flooding from a 0.5% AEP event by 2108. 30 properties would be immediately at-risk, post breach (failure) of the defences. The Lydd Ranges and infrastructure would also be at risk. The site is a premier live firing... More
    Opened 21 July 2021
  • River Slea Flood Resilience Project

    Welcome to the River Slea Flood Resilience Project! This webpage contains up to date project information, including the latest newsletters, upcoming events and key project updates. This page will be regularly updated to keep you informed and aware of project progress. Contents Click here for the contents page What is the River Slea Flood Resilience project? Tell Us! Where is the project area? What are the project objectives? Project... More
    Opened 21 July 2021
  • Lydd Ranges Sea Defences Scheme

    Welcome to the Lydd Ranges Sea Defences Scheme information page. Work on the scheme started in July to improve the existing sea defences to reduce the risk of coastal flooding. Once completed it will help better protect this environmentally important area, the Ministry of Defence (MoD) Lydd firing range and people, property and businesses within the Romney Marsh area from coastal flooding and erosion. To learn more about the scheme please watch our welcome video . ... More
    Opened 21 July 2021
  • Lydd Ranges Sea Defences Scheme - Upcoming works

    May 2023 update Shortly, we will be resuming works on the Lydd Ranges Sea Defences Scheme. We expect the scheme to be complete at the end of 2023. The works we will complete this year and timings are summarised in the table below. The majority of the works are continuations of works from the previous years, using similar equipment and methodology, with two exceptions: This year, some rock will be moved by lorry to planned works in Shoreham, Sussex. This will... More
    Opened 21 July 2021
  • Lydd Ranges Sea Defences Scheme - Environment

    The  Lydd Ranges frontage extends eastwards from Jury’s Gap near Camber in East Sussex and for approximately 8.2km to Dungeness nuclear power station, Kent. The area within and surrounding the Lydd Ranges frontage is of high nature conservation value. This is reflected in the extensive statutory designations that are present throughout the study area, including: Dungeness Special Area of Conservation (SAC) Dungeness, Romney Marsh and Rye... More
    Opened 21 July 2021
  • Lydd Ranges Sea Defences Scheme - Gallery

    November 2021: The groyne installation progress and finished works for the year. The barge taking shingle to the beach as part of the interim beach nourishment. Work gets underway on the Lydd Ranges Scheme The first groyne pile going in at Lydd Ranges. The Green Wall track looking west from the Jury’s Gap compound. Timber groynes will be instated to stabilise the beach and new beach... More
    Opened 21 July 2021
  • Hardmead Sluice Replacement Project Information Page

    What we have done We have replaced and improved the gates and operating equipment at Hardmead Sluice. The previous gate had reached the end of its working life after 45 years of service. A failure of Hardmead Sluice would have increased flood risk and loss of control of upstream water levels for navigation, water supply, amenity and environmental needs. The previous single sluice gate has been replaced with two smaller gates to give greater flexibility in operating and maintaining... More
    Opened 25 June 2021
  • Oxford Flood Alleviation Scheme - Welcome

    Page 1 – Welcome Page 2 – Background and benefits Page 3 – Updates and CPO Information Page 4 – Your Questions Introducing the Oxford Flood Alleviation Scheme What is the Oxford Flood Alleviation Scheme? The Oxford Flood Alleviation Scheme will create a new stream with wetland wildlife corridor to the west of Oxford to reduce flood risk in the city and surrounding areas. The scheme will reduce... More
    Opened 17 May 2021
  • Oxford Flood Alleviation Scheme - Background and benefits

    Page 1 – Welcome Page 2 – Background and benefits Page 3 – Updates and CPO Information Page 4 – Your Questions On this page we provide information about the Oxford Flood Alleviation Scheme, including the scheme design, benefits and environmental features. Please click on each of the headings below to find out more. Why does Oxford need a major flood scheme? More Information Flooding in Oxford Oxford has a long... More
    Opened 17 May 2021
  • Oxford Flood Alleviation Scheme - Your Questions

    Page 1 – Welcome Page 2 – Background and benefits Page 3 – Updates and CPO Information Page 4 – Your Questions Your Questions Click on a topic below to be taken to that section. Environment and wildlife Recreation and public access Costs Construction Traffic Long term management and legacy Scheme d esign Flood risk Environment and wildlife How will the scheme increase... More
    Opened 17 May 2021
  • Oxford Flood Alleviation Scheme - Updates and CPO Information

    Page 1 – Welcome Page 2 – Background and benefits Page 3 – Updates and CPO Information Page 4 – Your Questions Latest news Compulsory Purchase Order We have made our Compulsory Purchase Order (CPO) for the Oxford Flood Alleviation Scheme. A CPO is a legal process that allows land, property and rights of access to be obtained from a landowner when there is a compelling case that the land is needed in the public interest and can... More
    Opened 17 May 2021
  • Information to support the Environmental Permitting Regulations (EPR) permit reviews for Food, Drink and Milk Industries.

    The Industrial Emissions Directive (IED) requires EPR permits to be reviewed within four years of publication of the relevant Best Available Techniques Reference Document (BRef) BAT conclusions. The Food, Drink and Milk Industries BRef was published on 4 December 2019. More
    Opened 11 May 2021
  • Canvey Island southern shoreline revetment project - information page

    This page will be closing next month (April) and all information is now available on Castle Point Borough Council's website until September, on this link: https://www.castlepoint.gov.uk/canvey-island-southern-shoreline-revetment-project This project will maintain the existing high level of tidal flood risk protection to thousands of homes, businesses and infrastructure on Canvey Island into the future, a key aspiration of the Thames Estuary 2100 Plan . It will protect the... More
    Opened 10 May 2021
  • Farlington Marshes Project information page

    Welcome to the Farlington Marshes Project information page. As the project progresses, we will provide updates through this information page and via our newsletter. To be added to the mailing list for the newsletter, please email us . UPDATE: Farlington Survey Results (May 2024) The Farlington Marshes Questionnaire responses have been collated and analysed. Over 3500 people took part over the three month period. It is clear... More
    Opened 30 March 2021
  • Citizens’ Jury for the Ouseburn River in Lower Tyne information page

    The Rethinking Water Citizens’ Jury was put together by the Environment Agency and a Local Advisory Group working with the Involve Foundation. The jury, which took place at the end of January 2021, debated local issues, shared ideas and questioned environmental experts on all aspects of the water environment. This project to involve communities in decisions about the future of their local river has taken place in the North East of England. The Ouseburn Citizens’ Jury... More
    Opened 17 March 2021
  • Saltfleet to Gibraltar Point Strategy Enhancing the Lincolnshire Coast

    The Environment Agency is working to reduce flood risk to 20,000 residential homes, 1,700 businesses, 24,500 static caravans, 35,000 hectares of farmland and a bustling tourist industry. The Lincolnshire coastal flood plain has a long history of flooding from the sea and many forms of defence are now in place including sand dunes, seawalls, rock/timber structures and beaches. Just over 45,000 people live within the Saltfleet to Gibraltar Point Strategy area and each... More
    Opened 11 March 2021
  • Beales Corner, Bewdley, Flood Risk Management Scheme

    Page created February 2021. Last u pdated 23 December 2024 *Project Updates* End of Year Update - 23 December, 2024 Please see our end of year update on the Beales Corner, Bewdley Flood Risk Management Scheme. 8 November, 2024 Please see the 8 November 2024 update on the Beales Corner, Bewdley Flood Risk Management Scheme. 23 August, 2024 Please see the 23... More
    Opened 2 March 2021
  • Rethinking Water Citizens’ Juries overview information page

    The Environment Agency and its partners are holding five targeted Rethinking Water Citizens’ Juries to discuss the important question: How do you connect with water in your local environment, and what needs to be changed in the future to benefit people and wildlife? This is about involving communities in decisions about the future of their local river. Listening and working with others to understand their priorities is an essential element... More
    Opened 22 February 2021
  • Thorney Island Habitat Creation Project Information Page

    Welcome to the Thorney Island Habitat Creation Project The Environment Agency have created this page to provide easy access to information on the Thorney Island Habitat Creation Project. This page will be updated as the project progresses, so please check back for project updates. If you would like to be added to our mailing list and receive project updates, please email Thorney.Island@environment-agency.gov.uk Project Vision The creation of... More
    Opened 14 October 2020
  • Tenbury Wells Flood Risk Management Scheme

    Page created 18 September 2020. Last updated 11 March 2025. Tenbury Wells flood scheme update: The Environment Agency has been working with partners and the community to propose a flood scheme for Tenbury Wells in Worcestershire The scheme would include walls, embankments and flood gates to help reduce the risk of flooding to the town from the River Teme and Kyre Brook There is a shortfall in funding... More
    Opened 18 September 2020
  • Tadcaster Flood Alleviation Scheme (FAS) Information Page

    We can't prevent flooding from rivers and streams entirely, but we can reduce the risk of flooding. By working with our partners and people who are at risk, we can minimise it’s effects and reduce the damage it causes. Welcome to the Tadcaster Flood Alleviation Scheme Information Page. We have created this page to share information and updates on the planned flood alleviation scheme for Tadcaster. We will continue to add information to this... More
    Opened 26 August 2020
  • Lowdham Cocker Beck Flood Alleviation Scheme

    Latest Construction News For all latest construction updates, please refer to our Lowdham Storage Reservoir Facebook page which will present all the regularly updated information on the Flood Alleviation Scheme (FAS). 05/06/2024 - Lowdham Flood Storage Reservoir Construction Update Lowdham Cocker Beck Flood Alleviation Scheme Key Facts about the Lowdham Flood Alleviation Scheme 191 properties better protected from... More
    Opened 1 July 2020
128 results. Page 4 of 5