Find activities

1605 results

  • CH2 4NR, Encyclis Limited, EPR/LP3132FX/V009: environmental permit consultation

    We are seeking your comments on an environmental permit application received from Encyclis Limited for: Protos Energy Recovery Facility Grinsome Road Elton Chesire CH2 4NR We can take account of Relevant environmental regulatory requirements and technical standards. Information on local population and sensitive sites. Comments on whether the right process is being used... More
    Closed 7 February 2024
  • BL0 0DD, Churchill Enviro Limited, EPR/GP3733FE/V004: environmental permit consultation

    We are seeking your comments on an environmental permit application received from Churchill Enviro Limited for Fletcher Bank Quarry Landfill Site Whalley Road Ramsbottom BL0 0DD We can take account of Relevant environmental regulatory requirements and technical standards. Information on local population and sensitive sites. Comments on whether the right process is being used for the... More
    Closed 6 February 2024
  • IP23 7NW, Ford Farms (Suffolk) Ltd, EPR/SP3242SF/A001: environmental permit consultation

    We are seeking your comments on an environmental permit application received from Ford Farms (Suffolk) Ltd for Red House Farm Red House Farm Eye IP23 7NW We can take account of Relevant environmental regulatory requirements and technical standards. Information on local population and sensitive sites. Comments on whether the right process is being used for the activity, for example... More
    Closed 5 February 2024
  • Guildford Flood Alleviation Scheme

    Introduction The Environment Agency, Guildford Borough Council, and Surrey County Council are working together to find a sustainable flood risk management scheme for Guildford town centre. The scheme will: improve the natural environment build better connections between Guildford town centre and the River Wey Guildford has a long history of flooding from the River Wey.... More
    Opened 2 February 2024
  • Maidenhead Windsor and Eton Flood Alleviation Scheme

    The Maidenhead, Windsor and Eton Flood Alleviation Scheme The Maidenhead, Windsor and Eton Flood Alleviation Scheme is made up of a combination of different elements in to reduce flood risk in the area. These include Cookham - flood walls, flood gates and earth embankments North Maidenhead - flood walls and an earth embankment The Jubilee Flood Relief Channel These were designed to work together to reduce the risk of flooding to approximately 3,000... More
    Opened 1 February 2024
  • CT2 0PU, Valencia Waste Management Limited, EPR/XP3434HX/V013: environmental permit consultation

    We are seeking your comments on an environmental permit application received from Valencia Waste Management Limited for Shelford Landfill Site Shalloak Road Canterbury CT2 0PU We can take account of Relevant environmental regulatory requirements and technical standards. Information on local population and sensitive sites. Comments on whether the right... More
    Closed 31 January 2024
  • Barton to New Holland Tidal Flood Alleviation Scheme - Feedback Survey

    Thank you for clicking on the link to take part in our short survey about the Barton to New Holland Tidal Flood Alleviation Scheme. We appreciate you giving us a few minutes of your time to answer a few questions and share your thoughts about tidal flood resilience. More
    Closed 31 January 2024
  • Buckden Landfill Site

    Welcome to Buckden Landfill Site community briefing page. As the primary regulator of Buckden Landfill, we publish this page to share information about the landfill site and to outline some of our activities to keep the public informed. We aim to provide updates monthly. Our Role Our role as an environmental regulator is to work with people and businesses. We provide advice and guidance and help them do the right thing for people... More
    Opened 25 January 2024
  • Loughborough Information Page

    Update - Dec 2022 We have recently updated the river modelling for Loughborough to improve our understanding of flood risk in the town. This includes the Wood Brook and Burleigh Brook. The updated flood outlines can be seen here Flood map for planning - GOV.UK (flood-map-for-planning.service.gov.uk) and they show a reduction in the areas of Loughborough at risk from flooding. We have done this by using better and more accurate data, and using the latest hydrology and... More
    Closed 22 January 2024
  • SL1 4AN, K D 2 Limited, EPR/JP3647JU/A001: environmental permit consultation

    We are seeking your comments on an environmental permit application received from K D 2 Limited for KLON-06 Slough SL1 4AN We can take account of Relevant environmental regulatory requirements and technical standards. Information on local population and sensitive sites. Comments on whether the right process is being used for the activity, for example whether the... More
    Closed 22 January 2024
  • DN14 7QH, Sir Richard Sutton Limited, EPR/XP3324SN/A001: environmental permit consultation

    We are seeking your comments on an environmental permit application received from Sir Richard Sutton Limited for Manor Farm Poultry Unit Manor Farm Healing DN14 7QH We can take account of Relevant environmental regulatory requirements and technical standards. Information on local population and sensitive sites. Comments on whether the right process is... More
    Closed 22 January 2024
  • NN4 7PW, Miswa Chemicals Limited, EPR/AP3398LQ/V002: environmental permit consultation

    We are seeking your comments on an environmental permit application received from Miswa Chemicals Limited for Miswa Chemicals Ltd 54 Caswell Road Brackmills Industrial Estate Northampton NN4 7PW We can take account of Relevant environmental regulatory requirements and technical standards. Information on local population and sensitive sites. Comments on whether the right process is... More
    Closed 19 January 2024
  • Heacham bathing waters

    Overview Bathing water season The Bathing Water Regulations 2013 set out the bathing water season, which runs from 15 May to 30 September inclusive each year. We are responsible for sampling for 2 types of bacteria at designated bathing waters during the season. The regulations require the sampling to start just before the season and include some weekend and bank holiday samples, when the largest number of bathers are often present. What does a bathing... More
    Opened 15 January 2024
  • TA5 1UD, NNB Generation Company (HPC) Limited, EPR/JP3122GM/V011: environmental permit consultation

    We have received an application under the Environmental Permitting (England and Wales) (Amendment) Regulations 2016 from NNB Generation Company (HPC) Limited (NNB GenCo) to change (vary) an existing water discharge activity (WDA) permit (EPR/JP3122GM) for Hinkley Point C (HPC) construction site at HPC power station Wick Moor Drove near Bridgwater Somerset TA5 1UD Under permit variation reference number EPR/JP3122GM/V011 the... More
    Closed 14 January 2024
  • TA5 1UD, NNB Generation Company (HPC) Limited, EPR/XP3321GD/V005: environmental permit consultation

    We have received two applications under the Environmental Permitting (England and Wales) (Amendment) Regulations 2016 from NNB Generation Company (HPC) Limited (NNB GenCo) to change (vary) an existing water discharge activity (WDA) permit (EPR/XP3321GD) for Hinkley Point C (HPC) construction site at HPC power station Wick Moor Drove near Bridgwater Somerset TA5 1UD Under permit variation reference number EPR/XP3321GD/V005... More
    Closed 14 January 2024
  • SG18 9SE, Anglian Water Services Limited, EPR/JB3907FQ/A001: environmental permit consultation

    We are seeking your comments on an environmental permit application received from Anglian Water Services Limited for Poppyhill Water Recycling Centre Cambridge Road Biggleswade SG18 9SE We can take account of Relevant environmental regulatory requirements and technical standards. Information on local population and sensitive sites. Comments on whether the right process is being used for the... More
    Closed 12 January 2024
  • NN17 5XH, Encyclis Limited, EPR/EP3629SF Ver2 : environment permit consultation

    We are seeking your comments on an environmental permit application received from Encyclis Limited for Corby Energy from Waste Facility Shelton Road Willowbrook East Industrial Estate NN17 5XH We can take account of Relevant environmental regulatory requirements and technical standards. Information on local population and sensitive sites. Comments on whether the right process is... More
    Closed 9 January 2024
  • DN15 0DH, Ellgia Limited, EPR/WP3397FZ/C007: environmental permit consultation

    We are seeking your comments on an environmental permit application received from Ellgia Limited for Ellgia Scunthorpe Winterton Road Scunthorpe North Lincolnshire DN15 0DH We can take account of Relevant environmental regulatory requirements and technical standards. Information on local population and sensitive sites. Comments on whether the right process is being used for the activity, for example... More
    Closed 8 January 2024
  • River Wharfe and Ilkley bathing water site information page

    Welcome to the River Wharfe and Ilkley bathing water site information page River Wharfe catchment The River Wharfe and its tributaries flow from the headwaters in the Yorkshire Dales National Park down to its confluence with the River Ouse near Cawood. Along the way it passes through a number of villages and towns including Kettlewell, Grassington, Addingham, Ilkley, Otley, Wetherby and Tadcaster. The Environment Agency, along with many... More
    Closed 5 January 2024
  • S9 5AP, Brocklebank & Co. (Demolition) Limited, EPR/FB3205KX/V002: environmental permit consultation

    We are seeking your comments on an environmental permit application received from Brocklebank & Co. (Demolition) Limited for: Brocklebank Recycling Facility Allende Way Sheffield S9 5AP We can take account of Relevant environmental regulatory requirements and technical standards. Information on local population and sensitive sites. Comments on whether the right process is being... More
    Closed 4 January 2024
  • WA1 4RF, Murfitts Industries Limited, EPR/EP3925ST/A001: environmental permit consultation

    We are seeking your comments on an environmental permit application received from Murfitts Industries Limited for Warrington Tyre Recycling Facility 48 Hardwick Grange Warrington WA1 4RF We can take account of Relevant environmental regulatory requirements and technical standards. Information on local population and sensitive sites. Comments on whether the right process is being used for the... More
    Closed 3 January 2024
  • TS10 5QW, Redcar Holdings Limited, EPR/TP3502MS/A001: environmental permit consultation

    We are seeking your comments on an environmental permit application received from Redcar Holdings Limited for: Redcar Energy Centre Land at Redcar Bulk Terminal Redcar TS10 5QW We can take account of Relevant environmental regulatory requirements and technical standards. Information on local population and sensitive sites. Comments on whether the right process is being used for the activity,... More
    Closed 2 January 2024
  • Matlock Flood Wall

    Construction Update August 2023 Jackson Civil Engineering are working on behalf of the Environment Agency to build a replacement flood defence at Matlock and reinstate flood protection from the River Derwent. Our project is being delivered in partnership with Derbyshire County Council and Derbyshire Dales District Council. Construction of the flood wall is now complete, with the entire wall and tie in sections fully cladded with locally sourced... More
    Closed 1 January 2024
  • Castle Mill Sluice Decommissioning Project

    Welcome This is the Environment Agency's information page dedicated to essential construction work at Castle Mill Sluice, on the River Great Ouse, Bedford. The Environment Agency is carrying out the decommissioning of the mechanical and electrical components of Castle Mill Sluice and replacing the three gates with a fixed weir structure. In addition, we will remove the operators bridge, this will provide aesthetic benefits and once works are complete, the bridge will be... More
    Closed 31 December 2023
  • Removal of Dove Cliff weir - information page

    Page created July 2019. Last updated 8 April 2022. Since our last update in November 2021, we have continued with some ongoing land reinstatement works and started post-construction landscaping. With spring on the horizon, the wildflower seed mix, sown by our partners at Transforming the Trent Valley, has developed nicely. We are confident that it will continue to grow as expected through the summer and are ready to reseed where necessary once we see the coverage later in... More
    Closed 31 December 2023
  • Lower Mole Flood Alleviation Scheme Information Page

    Update June 2023 We have a new website for all the latest information on the Lower Mole Flood Alleviation Scheme at Lower Mole Flood Alleviation Scheme | Engage Environment Agency (engagementhq.com) . Please note that we will no longer be updating this site. Update - February 2022 update We are writing to update you on work we are carrying out on the Lower Mole. In our November 2021 update newsletter, we mentioned that our project team were working through a number of... More
    Closed 31 December 2023
  • BS11 0YU, Viridor Avonmouth Waste Services Limited, EPR/SP3301LA/V003: environmental permit consultation

    We are seeking your comments on an environmental permit application received from Viridor Avonmouth Waste Services Limited for Severn Road Resource Recovery Centre Severn Road Avonmouth Bristol BS11 0YU We can take account of Relevant environmental regulatory requirements and technical standards. Information on local population and sensitive sites. Comments on whether the right process is... More
    Closed 29 December 2023
  • BS13 8AF, Valencia Waste Exeter Limited, EPR/BT7272IW/V013: environmental permit consultation

    We are seeking your comments on an environmental permit application received from Valencia Waste Exeter Limited for Yanley Landfill Bridgewater Road Bristol BS13 8AF We can take account of Relevant environmental regulatory requirements and technical standards. Information on local population and sensitive sites. Comments on whether the right process is being used for the activity,... More
    Closed 28 December 2023
  • Eardisland Scheme

    We had hoped for a settled start to 2024 however we were saddened to learn that further flooding had impacted the residents of Eardisland in early January, courtesy of Storm Henk. Storm Henk brought heavy and persistent rain to many parts of the UK, causing many rivers to record their highest ever levels. Sadly this also appears to be the case with the River Arrow which lead to some property flooding in the village. As most residents will know all too well, the frequency of... More
    Opened 24 December 2023
  • Peckfield Landfill Site

    Introduction to Peckfield Landfill Site This page has been created to provide further information around our regulation work at Peckfield Landfill Site, Micklefield, operated by Caird Peckfield Limited (CPL). We are aware of the ongoing landfill gas odours currently being experienced by residents of Micklefield and surrounding villages and appreciate that this must be a frustrating and unpleasant situation. Update 08 April 2024 This message has been produced by... More
    Opened 22 December 2023
1605 results. Page 5 of 54